Setup & Care
Setup & Care
Setup Instructions
Setup Everything is 95% assembled in the bag when you take it out. Fill the sand bags 1st, then slide the 2 loose poles in the front sleeve of the shade, and connect them at the “T” connector & main pole. Fully erect the main pole, face to the direction of the wind, and shove the bottom into the sand (shove at the very bottom, and a few inches is fine). Pull the sand bags out in a diagonal direction from the front until the lines are tight, and adjust through-out the day as needed (the wind may change, which the shade will adjust by itself like a kite).
Tear-down is the reverse, just pull the main pole out of the sand and lay everything down (this will keep it from flapping in the wind). Pull poles out, empty sand, & break all poles down. The the main pole goes in 1st (“T” connector down), followed by the other 2 poles. Then shove the shade in the bag like a parachute.
Care Instructions
For best results at setup, try to rinse any sand from the poles & main connector after use. Do not torque on the poles at anytime. If you are on hard packed sand, and the main pole will not shove in the sand easily, make a hole & fill in around it.
Additional Support or Questions: please email us at contact@southernsail.com.
Thanks, and we hope you enjoy your shade as much as we do.
All the best, The Yates Family!

